Construction of Arberi Road (Ura e Vashes-Bulqize) Lot 3

PROJECT DETAILS

1,840m

Total length

11m with 2 lanes and 15.4m with 3 lanes

Road  Width

11,300m3

Shotcrete/Concrete in tunnel

1200 ton

Steel reinforcement for tunnel

10,376 m

Road length

1,857,100 m3

Earth works excavation

41,200m2

Asphalt

80,000 m3

Sub base and base

464m

Tunnel length

736,821 m3

Filling

46,000 m3

Tunnel excavation

PROJECT DESCRIPTION AND GALLERY

Contrator:

GJOKA Konstruksion j.s.c

Client:

Road Authority

Consulting engineer:

Infratranprojekt shpk

This project is finished on June 2015