Hydropower of Lenie – Shales – Strelce, Korça Region

PROJECT DETAILS

119,345m3

Earth works excavation

4,880 m

Total length steel pipes

7,559m3

Concrete

3,397 m

GRP Total Length

Φ 1,000 – 1,100 - 1,200mm

Steel Pipes

Φ 700

Glass Reinforced Plastic pipe line (GRP)

PROJECT DESCRIPTION AND GALLERY

Installed power:

6170 kW

Employer:

Ministry of Energy and Indrustry  of Albania

Consulting engineer:

E.B.S shpk, Ing. Fahri Maho