National Road Qeparo-Sarande, Lot 4

PROJECT DETAILS

6.16 km

Length

21,000m3

Filling

10,839m3

Concrete

9m

Width ( 2 x 3.5 m asphalt + 2 x 1m jetty )

26,000m3

Sub base and base

530ton

Steel Reinforcement

73,206m3

Earth works excavation

86,200m2

Asphalt

PROJECT DESCRIPTION AND GALLERY

Client:

General Directorate of Roads

Consulting engineer:

“Infratransproject shpk “