Reconsidering the Use of Tirana Water Supply Source of Shen-Meri

PROJECT DETAILS

2.1 km

Tunnel Length

17 km Ø 863.6

Steel pipe

PROJECT DESCRIPTION AND GALLERY

Client:

Tirana Water Supply Enterprise

Supervisor:

ERALD-G sh.p.k.

Consulting engineer:

“Infratransproject shpk “