reconstruction of road bridge shulbatër-minor gurë, dibër region

PROJECT DETAILS

Small bridges

Bridge HD 5m, L=5m, Width 6m, 2pc –BridgeHD 10m, L=10m

6m,1pc

Width – Bridge HD 5x10m, L=50 m, Width 6m, 1pc

33,600m3

Sub base and base

6m, 2pc

Width – Bridge HD 2x10m, L=20m

415,300m3

Earth works excavation

165,100m2

Asphalt

6m, 1pc

Width – Bridge HD 4x10m, L=40m

100,500m3

Filling

11,300 m3

Concrete

PROJECT DESCRIPTION AND GALLERY

C lient:

Albanian Development Fund

Investor:

Council of Europe Development Bank ( CEB )

Supervisor:

Louis Berger, and IRD Engineering/Eptisa

Consulting engineer:

Roughton International, UK