PROJECT DETAILS

CONSTRUCTION OF THE ARBERI ROAD
(Dalje Ura e Vashes – Bulqize) Lot 1,2,3

Client:

Road Authority

Consulting Engineer:

InfraTransproject shpk.

Finished :

June 2015
Main Data of the Arber Road (Dalje Ura e Vashes – Bulqize)
Total length:

10,840 m

Road Length:

10,376 m

Tunnel length:

464 m

Road Width:

11m with 2 lanes and 15.4m with 3 lanes
Earth works excavation:

1,857,100 m3

Tunnel excavation:

46,000 m3

Filling:

736,821 m3

Sub base and base:

80,000 m3

Asphalt:

41,200 m2

Shotcrete/Concrete for tunnel:

11,300 m3

Steel reinforcement for tunnel:
1200 ton