During the visit 📍 in Dibra region the inspection of Vasha Bridge took place. The bridge connects T5 and T6 tunnels in Arbri road 🛣.
The bridge which has a length of 242 meters is composed of a truss in arch shape.
The entire remaining part of Arbri road to be build is 54 km and up to now 28% of the works is realized 👏.
Based on contract the road should end in 44 months but with the works intensity done so far the road is expected to end sooner.

Click here to read the original article

https://www.facebook.com/267225880099293/posts/1269432166545321/